How EV charger load adds to your transformer
Each AC or DC charger draws rated power while vehicles charge. Multiple guns may operate simultaneously at peak.
- Sum connected kW, then apply diversity based on usage pattern
- Add existing building load (HVAC, lifts, lighting)
- Include power factor and harmonics considerations for DC stacks
- Reserve headroom (typically 20–30%) for future bays
Illustrative sizing scenarios
Four 22 kW AC chargers in a society may need a dedicated panel and possible transformer upgrade if the existing load is high.
A 120 kW or 240 kW DC hub usually requires dedicated HT/LT infrastructure planned with DISCOM and a licensed electrical consultant.
Thunder EV's AI Project Planner captures bay count and charger mix to flag upgrade scope early.